Two Strand Continuous Billet Casting Facility

The project was a 2-strand continuous billet casting facility with a production output capacity of 108,000 MT per year. Fildravo provided detailed engineering design and construction management services for the following:

  • Concrete building foundation and its superstructure.
  • Concrete foundation for equipment.
  • Water treatment plant building, including tanks, pumps, and equipment foundations.
  • Generator foundations and substation.
  • Elevated cooling water tank.
  • Facility drainage system.
  • Piping system for cooling water and all utility lines.
  • Ductwork and exhaust system.
  • Electric systems for equipment lighting, instrumentation, and controls.

 

Detailed Engineering Design

  1. Structural Design
  2. Foundation Design
  3. Sanitary Design
  4. Electrical Design
  5. Mechanical Design
  6. Preparation of Design Reports
  7. Preparation of Contract Drawings and Technical Specifications
  8. Preparation of Bill of Quantities (BOQ) and Cost Estimates

 

Construction Supervision

  1. Pre-Construction/Tendering Stage
  2. Construction Stage
  3. Post Construction